TOWN OF TEMPLE, NEW
HAMPSHIRE
AUGUST 20, 2003
PLANNING BOARD
FINAL MINUTES OF PUBLIC MEETING
Board members
present: M. Connolly, R. Barnhisel, A. Pickman, T. Petro
Call to Order by
A. Pickman at 7:45 p.m.
- Review of 8/6/03 minutes. Move by Petro to accept the 8/6//03
minutes as amended, second by Barnhisel and voted in the unanimous
affirmative.
- Continuation of the
Messina site plan review hearing, M 08 L 008. Messina presented the Board with a draft revised site plan
that keeps the cabin units within the 100’ setback and moves the units 30’
apart. The unit size is 20’ x
21.2’ which is within the size allowance of 424 square feet set by the ZBA
and consent decree. The Board
discussed the new draft plan and suggested Messina move one cabin to clear
the existing septic tank for the cabins.
The Board discussed giving the draft site plan a conditional
approval. Move by Petro to give
preliminary approval to the revised site plan received by the Planning
Board on 8/20/03 subject to review of a final plan drawn by Mr. Bean
moving cabins to clear the existing septic tank and remain 30’ apart, and
include note #8 referencing
approval numbers to septic systems A & B, and note #9 and Mr. Bean’s
wet stamp. Second by Connolly and
voted in the unanimous affirmative.
The hearing was continued to 9/3/03.
- Barnhisel submitted a
list of suggested corrections to the Master Plan. The Board will review these and discuss
them at the 9/3/03 meeting. Petro
informed the Board the Board of Selectmen has raised the question of
reviewing the “home industry” section of the zoning ordinance. Petro asked the Board to look at this
section for the possibility of review.
- Move by Barnhisel to
adjourn, second by Connolly, meeting adjourned at 8:40 p.m.
Minutes
submitted by Debra Harling.